BS 8534
Procurement is the process of purchasing goods or services. There are many different routes by which the design and construction of a building can be procured. The selected procurement route should follow a strategy which fits the long-term objectives of the procurer's business plan and should give consideration to issues such as; speed, cost, value, quality, constraints, risk, asset ownership and financing.
Whilst historically we might have thought of clients as procurers, the extended supply chains that now contribute to construction means that procurers may also be contractors, and sub-contractors.
BS 8534 is the British Standard for 'Construction procurement policies, strategies and procedures - Code of practice'. It was originally developed in response to the 'Rethinking Standards in Construction' workshops which recommended a new standard for construction procurement. It was published as BS 8534:2011 on 31 August 2011 and launched on 26 September 2011.
It offers guidance on the development of policies, strategies and procedures for construction procurement. Whilst it is voluntary, it can be applied to both the public or private sector. It was developed by the Constructing Excellence network, with a committee chaired by Richard Ward of Eversheds.
The standard is based largely on previous best practice guidance, such as that produced by the Office of Government Commerce (OGC, now been absorbed into the Efficiency and Reform Group within the Cabinet Office) and is consistent with the Public Contracts Regulations.
It sets out procurement best-practice in relation to; policy, initiation, strategy, tactics, managing performance and delivery. There is a particular emphasis on:
- Preparing a business case.
- The use of value management.
- Collaborative working practices.
- The consideration of value in selection criteria.
- Early engagement with the supply chain.
- Change control.
- The adoption of formal gateways and reviews.
- Exit strategies.
Given the complexity of procurement, the standard necessarily remains fairly general in its approach and guidance, and it remains to be seen whether there will be widespread adoption in practice.
NB In parallel to this process, the International Standards Organisation (ISO) developed the two-part ISO 10845 Construction procurement (now also BS EN ISO 10845: Construction procurement). This focusses more on tendering and selection, whereas BS 8534 is concerned with the higher-level development of procurement policies, strategies and procedures.
[edit] Find out more
Related articles on Designing Buildings Wiki
- Collaborative practices.
- Constructing Excellence.
- Gateway review process.
- ISO 10845.
- PAS 1192-2
- PAS 1192-3
- PAS 91
- Procurement.
- Public procurement.
- OGC.
- OJEU.
External references
- BS ISO 10845-1 Construction procurement. Processes, methods and procedures.
- BS ISO 10845-2 Construction procurement. Formatting and compilation of procurement documentation.
- BS 8534.
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Construction Management, 8 July
NEETs crisis drives interest in trades, but apprenticeships barriers remain.
Passive fire protection webinar
MEP services penetration seals.
Where its at podcast (and video) - The role of the Architectural Technologist as an Expert Witness.
More than 200 remarkable buildings added to SAVE’s Buildings at Risk register.
Government scraps pre-application consultation for Nationally Significant Infrastructure Projects.
Historic England and infrastructure
New projects offer opportunities for the historic environment and local communities.
Construction Management, 2 July
Construction deaths halve in two years.
Green Book changes to drive investment in all parts of UK.
Minimum energy efficiency standards (MEES)
CIAT briefing on response to consultations for privately rented non-domestic properties.
Connect, collaborate, shape the future
Registration now live for UK Construction Week Birmingham.
CIOB announces Saul Humphrey FCIOB as new President for 26/27 term.
A quick, simple, and zero-bills solution to prevent overheating.